Dragon Bridge is 666m long, 37.5m wide and has six lanes for traffic. It opened to traffic on March 29, 2013, at a cost of nearly VND 1.5 trillion dong The bridge was designed by the US-based Ammann & Whitney Consulting Engineers with Louis Berger Group. Main span was completed on October 26, 2012. The bridge was opened to traffic on March 29, 2013, the 38th anniversary of the liberation of Da Nang City.This modern bridge crosses the Han River at the Le Dinh Duong/Bach Dang traffic circle, providing the shortest road link from the Da Nang International Airport to other main roads in Da Nang city, and a more direct route to My Khe Beach and Non Nuoc Beach on the eastern edge of the city. The bridge was designed and built in the shape of a dragon and to breathe fire and water each Saturday and Sunday night at 9 pm.